Complete Programs Regional workshop on end-to-end basin-based long-lead flood forecasting and warning

The regional workshop explored possibilities for regional cooperation on transboundary flood forecasting and warning in the South Asian Region (SAR), in support of The World Bank’s South Asia Water Initiative (SAWI). The workshop took stock of existing flood forecasting and warning efforts in South Asian Region (SAR) countries; featured technologies and learn from experiences from […]

Countries :
Bangladesh Bhutan India Nepal
Date : October 2015 – December 2015
Donor : World Bank

The regional workshop explored possibilities for regional cooperation on transboundary flood forecasting and warning in the South Asian Region (SAR), in support of The World Bank’s South Asia Water Initiative (SAWI). The workshop took stock of existing flood forecasting and warning efforts in South Asian Region (SAR) countries; featured technologies and learn from experiences from other countries/ regions; trained operational personnel on new modeling tools; introduced the elements and requirements of an operational basin-based long-lead flood forecasting and warning system; and explorde a regional program on end-to-end basin-based long-lead flood forecasting and warning system in SAR